The assembly process of a hybrid prefabricated house

The assembly process of a hybrid prefabricated house

Once production has been completed, the house is assembled on the building site. Thanks to the previously prepared structural elements, this process is fast, precise and efficient. All parts of the house arrive on site already manufactured in accordance with the...
Production of hybrid prefabricated houses

Production of hybrid prefabricated houses

Production of the elements required to build Gradat’s hybrid prefabricated houses takes place under controlled conditions, where every structural element is manufactured precisely in accordance with the design documentation. Thanks to the standardised house...
Obtaining the necessary building permits

Obtaining the necessary building permits

The design phase is followed by the procedure for obtaining the necessary building permits. This step is essential to ensure that the project fully meets all the legal, technical and spatial planning requirements laid down by the competent institutions. Gradat...
Designing a hybrid prefabricated house

Designing a hybrid prefabricated house

Design is the first and most important step in the process of building a Gradat hybrid prefabricated house. It is at this stage that the layout of the rooms, the dimensions of the house and the functionality of the space are determined, so that the home fully matches...