The design phase is followed by the procedure for obtaining the necessary building permits. This step is essential to ensure that the project fully meets all the legal, technical and spatial planning requirements laid down by the competent institutions.

Gradat provides its clients with full support throughout the entire process. Our expert team assists with the preparation of the required documentation, coordination with the designers and communication with the competent authorities, so that the permit procedure is as straightforward and as quick as possible.

Thanks to the standardised house concept, a large part of the technical documentation has already been optimised, which can further speed up the administrative side of the process. This reduces the scope for errors and shortens the time needed to obtain the necessary approvals.

Our aim is for clients to go through this step with clear information and expert support at every moment. Once the building permit has been obtained, the project is ready for the next phase – the production and preparation of the house elements for construction.

Other steps in the construction process:

  1. Design of hybrid prefabricated houses – more information
  2. Production of hybrid prefabricated houses – more information
  3. Assembly of hybrid prefabricated houses – more information
  4. Completion levels of hybrid prefabricated houses – more information
What does the process of obtaining a building permit involve?

The process involves preparing the project documentation, aligning the project with the spatial plan and submitting the application to the competent institutions. Once the documentation has been reviewed and all legal requirements have been met, the building permit is issued, allowing construction to begin.

How long does it take to obtain a building permit?

The time required to obtain a building permit can vary depending on the location, the complexity of the project and the processing speed of the competent institutions. On average, the procedure can take several months from the submission of the complete documentation.

Who prepares the documentation required for the building permit?

Gradat’s design team prepares the necessary project documentation and provides support by coordinating the process and communicating with the designers and the competent authorities, so that the procedure is as simple as possible for the client.

Does the project have to comply with the spatial plan?

Yes. Every project must comply with the local spatial plan, which defines the building conditions such as the maximum dimensions of the building, the distance from the plot boundary, the height of the building and other planning rules.

Can I start building before the building permit has been issued?

No. Construction may only begin once the building permit has been officially issued and has become final.